It was initially met with mixed reviews from some Running Crews, but September 2005 brought with it ONR's reintroduction of Brakemen and Yard Helpers to all freight trains and Yard Crews along the system. In this photo snapped at Cochrane, we see the first 3 man 414 Crew i've seen in a long time (tonight's Brakeman Glen lines a switch while tonight's Conductor Chad peers down the track ahead with his switchlist in hand) as they ready to make up their southbound consist before returning south that evening to Englehart.

 

ONRGALLERY.COM 2013