As the temperature drops and September slowly turns into October, we see ONR Crews busy replacing ties and rail at Cochrane Junction October 2002. The old 90 pound rail and switch removed from the Junction will be replaced with 115 pound rail and more heavy duty switches. On the right of the photo you can see the new pre-assembled switch complete with 115 pound rail and a heavy duty frog waiting to be maneuvered into place.

 

ONRGALLERY.COM 2011